重慶升降機(jī)管道安裝質(zhì)量的好壞是關(guān)系到升降機(jī)工作性能是否正常的關(guān)鍵之一,,管路上應(yīng)盡量采用焊接方式,,在需檢修的地方盡量采用法蘭連接,閥臺(tái)進(jìn)出口安裝球閥,并合理的配置管夾及支架,。
1,、升降平臺(tái)鋼管安裝時(shí)對(duì)升降機(jī)鋼管接頭、法蘭件都要進(jìn)行質(zhì)量檢測(cè),,發(fā)現(xiàn)如有缺點(diǎn),,接頭、法蘭件都禁止運(yùn)用,應(yīng)替換,并用火油清潔和用氣吹凈,。
Ningbo lifting platform installation of lifts steel pipe fittings, flanges, parts quality testing should be carried out, if any shortcomings found, fittings, flanges, prohibit the use of parts should be replaced with clean kerosene and gas purge.
2,、升降平臺(tái)鋼管安裝時(shí)對(duì)現(xiàn)已酸洗過(guò)的管子要用氣吹凈,管道連接時(shí)不得強(qiáng)壓對(duì)口,,管子與連接件對(duì)口應(yīng)達(dá)到內(nèi)壁整齊,,局部錯(cuò)口不得超過(guò)管子壁厚的10%,焊縫高度不小于相鄰管子的最小壁厚,。
Ningbo lifting platform installation of steel has been pickled use gas blow pipe shall counterparts when extreme pressure pipe connections, pipes and fittings should reach the inner wall of neat counterparts, local fault mouth shall not exceed 10% of the wall thickness of the pipe, welding seam height of not less than the minimum wall thickness of the adjacent pipe.
3,、測(cè)量配管尺度,對(duì)已就位的升降機(jī)鋼管液壓閥臺(tái),、液壓泵站,、主機(jī)、輔機(jī)及有關(guān)部件的方位應(yīng)謹(jǐn)慎丈量,、力求精確,對(duì)接頭之間曲折部位較多,、形狀雜亂的管子要先做一個(gè)樣板,然后按尺度或樣板切開(kāi)管子。
Measuring pipe scale, in place of steel hydraulic valve lift station, orientation pump stations, main engine and related components should be carefully measured, and strive to precise parts of the twists and turns between the joints are more messy tube shape first make a model, and then press the scale or model cut pipe.
4,、檢測(cè)管子的質(zhì)量,要查明升降機(jī)鋼管材料,、尺度和質(zhì)量是不是符合規(guī)劃規(guī)則;查看管子外觀是不是有嚴(yán)重壓扁或曲折;查看管子內(nèi)外壁表面上是不是有腐蝕表象,外壁是不是有裂紋等缺點(diǎn).若有不合規(guī)則需求的或有嚴(yán)重缺陷的管子不得使用。
Quality testing of the pipe, to identify the lift steel materials, scale and quality is not consistent with the planning rules; see the exterior of the tube is not a serious crush or tortuous; see the outer wall surface of the pipe corrosion is not a representation on the outer wall is not a crack and other shortcomings. there are serious flaws in the pipe or if irregularities needs not be used.
5,、安裝升降平臺(tái)鋼管管道必須按規(guī)劃圖紙或?qū)嶋H測(cè)量合理安置,,管子的交叉要盡量減少。對(duì)于平行或交叉的管子之間,、管子和設(shè)備主體之間必須要相距12mm以上的間隙,,防止相互干擾和避免振動(dòng)時(shí)引起敲擊。
Ningbo lifting platform installation steel piping must be reasonable planning drawings or actual measurement placement to minimize cross tube. For parallel or cross between tubes between the tube and the device must be separated by 12mm above the main gap to prevent mutual interference when cause and avoid knocking vibration.
6,、升降平臺(tái)安裝時(shí)要精心檢查密封件質(zhì)量,,不合要求的密封件不準(zhǔn)使用。安裝密封件時(shí)要注意唇口方向,,并仔細(xì)安裝,,切勿劃傷或破損密封件,更不能漏裝,。
Ningbo lifting platform installation should carefully check the seal quality seal undesirable allowed to use. Note that when you install the seal lip direction and careful installation, do not scratch or damage the seal, not missing equipment.